YN-C905 Li Kai Acrylate Elastomeric Waterproof Coating
DETAIL
產(chǎn)品規(guī)格
YN-C905 Likai Acrylate Elastomeric Waterproof Coating
Product Introduction
YN-C905 Libai Acrylate Elastic Waterproof Coating is a highly elastic, colored, polymer-based nano waterproof material. It is scientifically processed using specialized self-crosslinking pure acrylic emulsion for waterproofing, waterproof nano-composite glue, and nano-materials as the basic raw materials, combined with a certain amount of modifiers, activators, anti-aging agents, auxiliaries, and pigments. After application, it forms a tough and highly adhesive elastic waterproof film.
Product Features
- High strength, high elongation, low temperature resistance, aging resistance, and suitable for exposed use;
- Strong adhesion and good elongation;
- Can be directly applied on various wet or dry substrates;
- Single-component, simple construction, and short construction period;
Scope of Application
It is suitable for wet or dry concrete substrates and metal roofs; suitable for waterproofing treatment of roofs, basements, interior and exterior walls, bathrooms, pools, etc. of new and old buildings; can be used in underground engineering, tunnels, bridges, reservoirs, etc.; can be used for sealing expansion joints, dividing joints, gutter outlets, through-wall pipes, etc.
Key Points of Construction
- Base Surface Preparation: The base surface should be flat, clean, firm, free from leakage and standing water. Uneven areas, protrusions, and cracks should be leveled, and internal and external corners should be rounded.
- Construction: Apply the coating using a rubber squeegee or roller brush, usually in 2-3 coats. The application should be even and consistent, with no missed areas. Subsequent coats should be applied after the previous coat has dried to the touch.
- Ensure even application without local sedimentation. Prevent sagging on vertical and inclined surfaces.
- Before the coating film has cured, protect it from being stepped on, piled with heavy objects, or punctured by sharp objects.
Precautions
- The construction temperature should be between 5°C and 35°C. Do not construct during rainy weather or when there is standing water on the base layer.
- The coating film takes 2-3 days to fully dry. In humid environments, the drying time should be appropriately extended.
- A closed water test can only be conducted after the coating film has fully dried. After passing the inspection, non-exposed materials should have a protective isolation layer constructed according to design requirements.
- Do not add water to the coating during application. Keep the bucket lid closed to avoid direct sunlight.
Construction Technology
- Brush painting, roller painting, and scraping methods can be used.
- When applying with a roller or brush, 2-4 coats can be applied according to the required coating thickness, with a time interval of 3-6 hours between each coat.
- For large-area waterproofing, it is recommended to apply the coating to vertical surfaces first, followed by horizontal surfaces. Apply in 2-3 coats, with each subsequent coat applied only after the previous coat has completely dried. Apply the subsequent coats in a direction perpendicular to the previous one.
- If there are cracks of 3mm or more on the roof, the gaps should first be filled with a mixture of this product and talcum powder or other powders to form a thick paste. Then, apply this product as per the usual construction process.
【Product Storage】: Store at a temperature not lower than zero degrees, and avoid direct sunlight.
【Execution Standard】: JG/T 375-2012
【Shelf Life】: Under normal transportation and storage conditions, the shelf life is 6 months from the date of production.
【Estimated Consumption】: For a 1mm thickness, the approximate consumption is 1.8~2.0kg per square meter (actual consumption depends on the substrate).